Artic embarked on a crucial partnership with KAMPT Hospital to address the pressing need for the replacement of ageing gas-fired boilers. Recognising the paramount importance of uninterrupted healthcare services, Artic carefully planned and executed the project, prioritising efficiency, safety, and compliance at every stage. This case study showcases Artic's strategic approach from start to finish highlighting our dedication to excellence in facilities management within the healthcare sector

Planning and Preparation

Artic commenced the project with a planning phase, conducting a comprehensive technical design assessment to determine the most suitable replacement solution for the gas-fired boilers at KAMPT Hospital. This involved collaborating closely with the hospital's management to understand their specific requirements and constraints.

We installed a temporary boiler to ensure uninterrupted heating and hot water services for patients, staff, and visitors during the replacement process. This strategic decision minimised disruption to hospital operations and maintained a comfortable environment for all patrons.

Execution and Installation

The installation phase involved the safe dismantling and disposal of the existing gas-fired boilers and associated equipment from the hospital premises. Artic's team adhered to strict safety protocols and environmental regulations throughout this process, ensuring proper disposal and minimal impact on the surrounding environment.

Following the removal of the old equipment, we expertly installed new boilers, pumps, and all associated pipework and valves according to the technical design specifications. Careful attention was paid to ensure optimal performance, efficiency, and compliance with industry standards.

Compliance and Quality Assurance

Throughout the project, Artic prioritised compliance with regulatory standards and safety protocols to safeguard the well-being of patients, staff, and visitors at KAMPT Hospital. The installation of the new boilers, pumps, and flue system was conducted in accordance with manufacturer guidelines and industry best practices.

Furthermore, we conducted thorough flushing of the newly installed pipework and boilers to remove any debris or contaminants, ensuring optimal performance and longevity of the system. The dosing of the system with appropriate chemicals further contributed to the preservation of water quality and the prevention of corrosion, thereby enhancing the lifespan of the equipment.

Commissioning and Handover

Upon completion of the installation phase, Artic commissioned the new boilers to verify their proper operation and performance. This involved rigorous testing and calibration to ensure that the equipment met the required safety and performance standards.

Finally, we provided KAMPT Hospital with all necessary certifications and an Operations and Maintenance manual, providing the hospital with essential documentation for ongoing maintenance and operation of the upgraded boiler infrastructure. This comprehensive handover process ensured that the hospital could confidently manage and maintain its new system for years to come.

Conclusion:

In conclusion, the successful completion of the boiler replacement project at KAMPT Hospital underscores Artic's unwavering commitment to delivering positive outcomes in Project management and installation works. Through accurate planning, precise execution, and stringent adherence to compliance and quality standards, Artic ensured minimal disruption to hospital operations while enhancing the efficiency and reliability of the boiler infrastructure.

This case study serves as a testament to Artic's expertise, professionalism, and dedication to meeting the unique needs of its clients, setting a benchmark for excellence in facilities management services within critical sectors such as healthcare.